Holy Transfiguration Coptic Orthodox Church

Home

/

Projects

/

Holy Transfiguration

Holy Transfiguration Coptic Orthodox Church

14715 Peyton Drive, Chino Hills, CA 91709

Client

Parish for Holy Transfiguration Coptic

GC

Grant General Contractors

Size

14,695 SF / 2.65 Acres

Duration

Dec 2022 – May 2024

Safety

Zero Accidents

[Photo Coming Soon]

[Photo Coming Soon]

[Photo Coming Soon]

Project Details

Client

Parish for Holy Transfiguration Coptic

General Contractor

Grant General Contractors

Project Type

Church Commercial Construction

Building Size

14,695 SF

Site Size

2.65 acres

Duration

December 2022 – May 2024

Market Sector

Faith-based commercial — education & sports areas

Project Team

Nick Wadenius

Project Manager

Joe Nigbor

Foreman

Zero Accidents

DSP has followed all safety and IIPP procedures to ensure a safe work environment, with zero accidents. Apprentices on this project were a mix of certified trainees and ABC SoCal unilateral program.

Scope of Work

Complete turnkey electrical for a 14,695 SF church facility.

DSP provided all power and low-voltage utility conduit to the site, all site lighting, and a complete turnkey building. A key challenge of the project was the power and low-voltage utility work, which required crossing a busy intersection with lane diversions and traffic control.

Throughout the project, DSP worked in direct coordination with the architect and general contractor to execute the parish’s needs with complete accuracy. DSP delivered all required contract items in accordance with the project plans and specifications, including additional underground utility work and enhanced accent lighting for the bell tower and cross.

Detailed Scope

Main Service — 1200A / 208/120v / 3ph / 4w. DSP installed an exterior mounted main electrical service with sub feeds into the building and an EV panel on the exterior.

DSP installed all contract and change order lighting with nLight programmed controls for the interior and exterior of the project.

DSP provided conduit and boxes only for the fire alarm system throughout the project.

DSP installed underground conduit to 6 future EV parking stalls with (2) 1″ conduits per location.

DSP installed conduit for SCE and telecom services. The installation crossed a main road and a large island in the middle of the road.

DSP provided above grade, below grade and wall rough conduits for the low voltage cabling and AV systems.

1200A main service. 165 luminaires. Complete turnkey delivery on 2.65 acres.

Project highlights.

Key technical specifications and notable deliverables from this tenant improvement project.

1200A

Main Service

1200A / 208/120v / 3ph / 4w. Exterior mounted main electrical service with sub feeds into the building and an exterior EV panel.

165

Luminaires Installed

Pole mounted parking lot lights, decorative large building sconces, down and wall wash can lights, hi-bay luminaires, decorative restroom sconces, and t-bar drop-in lights.

14,695 SF

Turnkey Building

Complete turnkey electrical for a two-story faith-based facility including 1st floor and small second floor, with education and sports areas.

6

Future EV Stalls

Underground conduit to 6 future EV parking stalls with (2) 1″ conduits per location for future charger installation.

208/120v

System Voltage

208/120v, 3-phase, 4-wire system. No transformers or generators installed. All emergency lighting is self-contained 90-minute battery backup.

0

Safety Incidents

Zero accidents recorded. Apprentices were a mix of certified trainees and ABC SoCal unilateral program. Full IIPP compliance.

Project Challenges

Road crossing & parish redesigns.

A key challenge of the project was the power and low-voltage utility work, which required crossing a busy intersection with lane diversions and traffic control. DSP installed conduit for SCE and telecom services across a main road and a large island in the middle of the road — requiring close coordination with the city, utility providers, and traffic management.

This project also had moderate delays driven by redesigns by the parish. Throughout these changes, DSP worked in direct coordination with the architect and general contractor to execute the parish’s needs with complete accuracy — including additional underground utility work and enhanced accent lighting for the bell tower and cross.