Client
Inland Empire Health Plan
GC
Angeles Contractors, Inc.
Size
33,000 SF / 3-Acre Site
Duration
June 2024 – April 2026
Safety
Zero Incidents
Project Details
Client
Inland Empire Health Plan (IEHP)
General Contractor
Angeles Contractors, Inc.
Project Type
Commercial, Interior Tenant Improvement
Project Size
33,000 SF interior, 3-acre site
Duration
June 2024 – Est. April 2026
Market Sector
Commercial — fitness, healthcare, demo kitchen, family resources
Project Team
Nick Wadenius
Project Manager
Joe Nigbor
Foreman
Joel Durman
Estimator
Zero Incidents
All work complied with DSP safety protocols. DSP has followed all safety and IIPP procedures to ensure a safe working environment. All apprentices acquired from Associated Builders and Contractors, SoCal.
Scope of Work
Complete electrical package
for a 33,000 SF facility.
DSP Electrical Contractors installed new SCE conduit, structures and main switchboard for new power requirements. This includes all new distribution boards, panels, luminaires, site lighting, interior power, and roof top unit power. DSP provided all required contract items per the plan and specifications of the project.
Detailed Scope
Provided all new 480/277v 1600 amp metered exterior main distribution board, 480/277v 1200a interior distribution board, 208/120v 800a exterior EV distribution board, and a 30kW diesel emergency standby generator with automatic and manual transfer switches.
Provided, roughed in, and wired all interior and exterior lighting.
Provided conduit and boxes only for a complete fire alarm system; including HVAC unit shutdowns, initiation devices, notification appliances, duct detectors, elevator recalls, shunt trip monitoring and fire water monitoring.
Installed underground boxes, conduit, wire and installed 11 double head and 2 single head EV charging stations.
Provided conduit and boxes for all low voltage and data future wiring.
Installed temp power from the onsite temporary power pole and set up spider boxes and temporary string lighting throughout the project interior.
560 luminaires. 1600 amp main switchgear. 13 EV charging stations.
Project highlights.
Key technical specifications and notable deliverables from this tenant improvement project.
560
Luminaires Installed
T-bar lights, can lights, decorative interior, cove lights, undercabinet, pendants, wall packs, linear building up lights, exterior recessed linear, pathway bollards, 15′ bollards, and site lighting poles.
1600A
Main Switchgear
1600 amp, 3-phase, 4-wire, 480/277v main switchgear. System includes 480/277v and 208/120v via step-down transformers throughout the project.
30kW
Emergency Generator
30kW diesel generator feeding a 60a/480/277v 3ph/4w panel, 45kVA stepdown transformer and a 90a/208/120v 3ph/4w panel. Automatic and manual transfer switches.
13
EV Charging Stations
11 double head and 2 single head EV charging stations with underground boxes, conduit, and wire. Fed by 208/120v 800a exterior EV distribution board.
33K SF
Interior Space
Commercial interior including fitness center, healthcare resources, demonstration kitchen, and family resource areas on a 3-acre site.
0
Safety Incidents
Zero incidents recorded. All work complied with DSP safety protocols and IIPP procedures. Apprentices from ABC SoCal.

Challenges & Solutions
Coordination was key.
With only one site entrance, scheduling for large deliveries needed to be precise as to not disturb site access and work.
This project had many scheduling challenges due to the number of unforeseen conditions, integrity of existing roof subfloor, 2nd floor subfloor, water intrusions at existing windows, owner issued bulletins and changes.
With the many changes and bulletins throughout the project, coordination with all trades has been key, especially HVAC duct shaft locations and sizes. Coordination with the HVAC contractor eliminated conflicts of new rough-in to accommodate the changing plans.